Cooling tower Refurbishment / direct replacement
As far as possible, the latest generation components are also installed during the replacement process in order to meet the increased requirements with regards to efficiency, performance, immission control and noise.
ENEXIO Service offers all necessary steps for this:
- Engineering
- Power measurement before / after
- installation / removal
- Refurbishment
- Commissioning

Other service potentials
Drift rate reduction
- Layer density
- Exchange profile against honeycomb design
- Location
Performance increase
- Increase fan blade angle
- Change cooling fill
- Change fan unit
- Improve air travel (reduce obstacles in- and outside tower)
Save energy
- Change cooling fill
- Optimize fan unit
Adaption to different operating point
- Optimize sprayer nozzle diameter
- Adjust cooling fill / fan unit
Noise reduction
- Install falling water noise attenuators
- Adjust fan unit
- Install noise attenuators
Service demands at hydraulic part
Water distribution
- Damages
- Pollution inside tower
- Hydraulic overload
- Less waterflow than designed

Drift eliminators
- Damages
- Pollution
- High droplet output rate

Cooling fill
- Damages
- Pollution
- Aging
- Insufficient cooling performance






+ Aging
Service demand at mechanical part
Fan
- Damages
- Imbalance
- Korrosion
- High moise impact
- Insufficient cooling performance





Gearbox / Geared motor
- Damages
- Corrosion
- Oil-leckages
- wear of bearings and sealings
- short circuit

Drive shafts
- Damages
- Corrosion
- Wear of coupling flex elements

Service demand on casing / structure
Fan casing
- Damage
- Exchange of abestos casing

Outside cladding
- Damages
- Leckages
- Aging
- Asbestos replacement

Air inlet louver
- Pollution
- Leckages
- Aging
- Damages


Access hatches
- Leckages
- not present
- too small


Requests